
The Job – 50m3 of Dirt
Our machines worked hard at this backyard renovation. After ripping up the existing soil we then removed & loaded 50m3 of dirt into skip bins. We were called in to create a flat surface to lay turf and the Kanga powered through it and we were able to get it done pretty quick.

The Results

It’s a huge part of every job and often gets overlooked but we always appreciate an easy clean up.
Leave a Reply