The Job – Revamped Driveway Lift, scrape, rock. That was the beginning of the plan for this revamped driveway. We carefully lifted all the existing pavers and stored these for later. Then a scrape through of the existing lawn and any debris that would get in the way of a level surface. Then we lay […]
Top Soil by Thomson Concrete
The Job – Top Soil This job required a bit of Kanga work in Koo Wee Rup. The job was to scrape and level the back yard and then spread 26 tonnes of top soil. For the first part we had to remove all the existing soil and vegetation to get a look at the […]
Concrete Area for Pool by Thomson Concrete
The Job – Concrete Area The owners of this place wanted to pave around the pool area but they needed some help with the base. So they called us in to set up a concrete area around the pool for the paving to be done at a later date. We brought the Kanga in to […]
Installing Drainage by Thomson Concrete
The Job – Installing Drainage There is lots of hard work that went into this one. The aim was to build a level yard for the owner and installing drainage so that this area would hold up to weather and time. First we dug out 10 cubic meters of soil and removed with the Kanga. […]
Opal Mining by Young Guns Opal Hunters
The Job -Opal Mining The Kanga loader is such a versatile machine and is perfect for the unique job that is opal mining.We use it to shift waste dirt out of the mine, sink prospect drill holes with the auger attachment and even break through hard conglomerates or blows with the rock-breaker.Using this incredible machine […]
Preventative Fencing by Vidgil Silt Fencing
The Job – Preventative Fencing Vidgil Silt Fencing based in Samford (QLD) operate throughout South East Queensland. They specialised in providing sediment control and environmental services (i.e. preventative fencing) to the construction industry, mainly focusing on adequately protecting sites from run off and soil erosion. Owning and operating several Kanga Kid machines with customised trenching […]
Walking Track by Roger Dowsett The Digger Man
The Job – Walking Track I was asked to come and build in a walking track for a local school. So me, the Kanga, my 4 in 1 and my leveller went to see what could be made of the mess. I used the bucket to dig up the grass and fallen tree parts from […]
500m Long Trench by Roger Dowsett The Digger Man
The Job – Digging a 500m Long Trench This next job sent me to the back of Sheparton in Dookie Hills to dig one of the longer trenches that I have had to do. When I first arrived I measured the length, making sure I knew what to expect and it was a 500m long […]
Overdue Yard Clean Up by Roger Dowsett The Digger Man
The Job – Yard Clean Up A well overdue yard clean up, using the machines 4 in 1 bucket to load green waste to be taken to the local tip. After the rain this green had become a bit waterlogged and heavy, but I didn’t have to be worried as the loader moved it without […]
Storm Water by Roger Dowsett The Digger Man
The Job – Storm Water This job had me trenching in a new housing development for storm water and normal water, and then backfilling same. I was able to get the trench sorted quick and didn’t have to worry about access issues. All that was left then was to get the pipes in, connected and […]
- « Previous Page
- 1
- 2
- 3
- 4
- 5
- …
- 11
- Next Page »